Pages

Wednesday, 27 April 2011

Possible Release-12 features

Not sure if everyone checked the presentation from yesterday, it has a slide that lists possible Rel-12 features that I have listed below:


Release 12 content not yet defined, but Study Items (SI) in Release 11 indicate where specification work is likely

•Study on IMS based Peer-to-Peer Content Distribution Services

•Study on IMS based Peer-to-Peer Content Distribution Services (Stage 2)

•Study on IMS Network-Independent Public User Identities

•Study on Integration of Single Sign-On (SSO) frameworks with 3GPP networks

•Study on Coordinated Multi-Point operation for LTE

•Study on UE Application Layer Data Throughput Performance

•Study on Uplink MIMO

•Study on Non Voice Emergency Services

•Study on UICC/USIM enhancements

•Study on Alternatives to E.164 for Machine-Type Communications

•Study on enhancements for Machine-Type Communications (MTC)

•Study on Support for 3GPP Voice Interworking with Enterprise IP-PBX

•Study on Security aspects of Integration of Single Sign-On (SSO) frameworks with 3GPP networks

•Study on Core Network Overload solutions

•Study on Continuity of Data Sessions to Local Networks

•Study on Non-MTC Mobile Data Applications impacts

•Study on System Enhancements for Energy Efficiency

•Study on Solutions for GSM/EDGE BTS Energy Saving

•Study on HSDPA Multipoint Transmission

•Study on Inclusion of RF Pattern Matching as a positioning method in the E-UTRAN

Release 11 completion date set for September 2012, Release-12 work will start after that.


No comments:

Post a Comment