Release 12 content not yet defined, but Study Items (SI) in Release 11 indicate where specification work is likely
•Study on IMS based Peer-to-Peer Content Distribution Services
•Study on IMS based Peer-to-Peer Content Distribution Services (Stage 2)
•Study on IMS Network-Independent Public User Identities
•Study on Integration of Single Sign-On (SSO) frameworks with 3GPP networks
•Study on Coordinated Multi-Point operation for LTE
•Study on UE Application Layer Data Throughput Performance
•Study on Uplink MIMO
•Study on Non Voice Emergency Services
•Study on UICC/USIM enhancements
•Study on Alternatives to E.164 for Machine-Type Communications
•Study on enhancements for Machine-Type Communications (MTC)
•Study on Support for 3GPP Voice Interworking with Enterprise IP-PBX
•Study on Security aspects of Integration of Single Sign-On (SSO) frameworks with 3GPP networks
•Study on Core Network Overload solutions
•Study on Continuity of Data Sessions to Local Networks
•Study on Non-MTC Mobile Data Applications impacts
•Study on System Enhancements for Energy Efficiency
•Study on Solutions for GSM/EDGE BTS Energy Saving
•Study on HSDPA Multipoint Transmission
•Study on Inclusion of RF Pattern Matching as a positioning method in the E-UTRAN
Release 11 completion date set for September 2012, Release-12 work will start after that.
No comments:
Post a Comment