Friday 29 May 2020

Visualisation of Intra-gNB Handover in an End-to-End Monitoring Tool


In my last blog post I described the message flow of an intra-gNB-DU handover.

Today I want show how such a handover can be visualized using a ladder diagram in an end-to-end passive monitoring tool. The tool shown in the figure below is the NETSCOUT nGenious Session Analyzer (nSA).

The data source is a cell trace feed according to 3GPP 32.421/32.423. Unfortunately F1AP and E1AP messages are missing in the trace so that we cannot distinguish if this is an intra- or inter-gNB DU handover.

(click to enlarge)

Nevertheless the tool offers the great advantage to find the handover procedure quickly within all the other messages of the trace. It also links the outgoing (source) and incoming (target) side in case that different feeds from different cells need to be combined.

For the NR RRC messages are send/received by the UE, but there is a good reason to show the icon "Cell" on top the ladder diagram. With this approach it is possible to spot immediately the changing cell location of the UE and NR RRC Reconfiguration procedure that is used to execute the handover. So the icon does not represent a cell, but an UE within a cell - and with a bit imagination you can recognize this in the icon graphic itself.

Selecting the handover message it is possible to open the Inline Decode tab and browse through the bits and bytes of NR RRC. As expected beside many other parameters the new UE Identity (new C-RNTI) to be used by the UE after arriving in the target cell is one of the most important information elements and confirms that this particular NR RRC Reconfiguration message is indeed the command for executing the intra-gNB handover.

Tuesday 26 May 2020

The Journey from Communications Service Provider (CSP) to Digital Service Provider (DSP)

Reliance Jio has recently been called as India's first digital service provider (DSP), but what exactly is a DSP and how does an existing mobile network transform from the traditional communications service provider (CSP) to a DSP?

Service Providers are also known as Telecommunications Service Provider (TSP) or Communications Service Provider (CSP). Basically, they refer to someone who provides services.

Mobile Network Operators (MNOs) are also referred to as Mobile Service Providers (MSPs) or Wireless Service Providers (WSPs). Even though CSP is a generic term, it generally always refers to MSP.

The term “Digital Service Provider" applies to any company that distributes media online. In the case of telcos, it's an organization that has moved on from offering core, traditional telecom services, to providing mobile broadband access, services, content and apps, all sold directly from the device.

Analysys Mason provides this simple equation to explain how a CSP can transform into DSP


Another way of representing this is to compare CSP & DSP as shown in the table below

We made a tutorial on this topic, the slides and video is embedded below. If you want to jump directly to the DSP part, move to 2:35 in the video.





Finally, another term that gets thrown around often confuses people is Telco & Netco


Telco stands for Telecommunications Company, which basically means Mobile Network Operator.

NetCo or Network cooperation is the practice of a Mobile Network Operator (MNO) sharing part of its Radio Access Network (RAN) with another MNO.

There are other terms like Towerco & Infraco that probably deserve their own post.


Related Posts:



Tuesday 19 May 2020

5G Dynamic Spectrum Sharing (DSS)

5G Dynamic Spectrum Sharing is a hot topic. I have already been asked about multiple people for links on good resources / whitepapers. So here is what we liked, feel free to add anything else you found useful as part of comments.


Nokia has a nice high level overview of this topic which is available here. I really liked the decision tree as shown in the tweet above. I am going to quote a section here that is a great summary to decide if you want to dive deeper.

DSS in the physical layer
DSS allows CSPs to share resources dynamically between 4G and 5G in time and/or frequency domains, as shown on the left of Figure 3. It’s a simple idea in principle, but we also need to consider the detailed structure at the level of the resource block in order to understand the resource allocations for the control channels and reference signals. A single resource block is shown on the right side of Figure 3.

The 5G physical layer is designed to be so similar to 4G in 3GPP that DSS becomes feasible with the same subcarrier spacing and similar time domain structure. DSS is designed to be backwards compatible with all existing LTE devices. CSPs therefore need to maintain LTE cell reference signal (CRS) transmission. 5G transmission is designed around LTE CRS in an approach called CRS rate matching.

5G uses demodulation reference signals (DMRS), which are only transmitted together with 5G data and so minimize any impact on LTE capacity. If all LTE devices support Transmission Mode 9 (TM9), then the shared carrier has lower overheads because less CRS transmission is required. The control channel transmission and the data transmission can be selected dynamically between LTE and 5G, depending on the instantaneous capacity requirements.


The second resource is this Rohde & Schwarz webinar here. As can be seen in the tweet above, it provides nice detailed explanation.

Finally, we have a Comprehensive Deployment Guide to Dynamic Spectrum Sharing for 5G NR and 4G LTE Coexistence, which is a nice and detailed whitepaper from Mediatek. Quoting a small section from the WP for anyone not wanting to go too much in deep:

The DSS concept is based on the flexible design of NR physical layer. It uses the idea that NR signals are transmitted over unused LTE resources. With LTE, all the channels are statically assigned in the time-frequency domain, whereas the NR physical layer is extremely flexible for reference signals, data and control channels, thus allowing dynamic configurations that will minimize a chance of collision between the two technologies. 

One of the main concepts of DSS is that only 5G users are made aware of it, while the functionalities of the existing LTE devices remain unaffected (i.e. LTE protocols in connected or idle mode). Therefore, fitting the flexible physical layer design of NR around that of LTE is needed in order to deploy DSS on a shared spectrum. This paper discusses the various options of DSS implementation, including deployment challenges, possible impacts to data rates, and areas of possible improvements.

NR offers a scalable and flexible physical layer design depicted by various numerologies. There are different subcarrier spacing (SCS) for data channels and synchronization channels based on the band assigned. This flexibility brings even more complexity because it overlays the NR signals over LTE, which requires very tight coordination between gNB and eNB in order to provide reliable synchronization in radio scheduling.

The main foundation of DSS is to schedule NR users in the LTE subframes while ensuring no respective impact on LTE users in terms of essential channels, such as reference signals used for synchronization and downlink measurements. LTE Cell Reference Signals (CRS) is typically the main concept where DSS options are designated, as CRS have a fixed time-frequency resource assignment. The CRS resources layout can vary depending on the number of antenna ports. More CRS antenna ports leads to increased usage of Resource Elements (REs). CRS generates from 4.76% (1 antenna port) up to 14.29% (4 antenna ports) overhead in LTE resources. As CRS is the channel used for downlink measurements, avoiding possible collision with CRS is one of the foundations of the DSS options shown in figure 1. The other aspect of DSS design is to fit the 5G NR reference signals within the subframes in a way to avoid affecting NR downlink measurements and synchronization. For that, DSS considers the options shown in figure 1 to ensure NR reference signals such as Synchronization Signal Block (SSB) or Demodulation Reference Signal (DMRS) are placed in time-frequencies away from any collision with LTE signals.

MBSFN, option 1 in figure 1, stands for Multi-Broadcast Single-Frequency Network and is used in LTE for point-to-multipoint transmission such as eMBMS (Evolved Multimedia Broadcast Multicast Services). The general idea of MBSFN is that specific subframes within an LTE frame reserve the last 12 OFDM symbols of such subframe to be free from other LTE channel transmission. These symbols were originally intended to be used for broadcast services and are “muted” for data transmission in other LTE UE. Now this idea has been adjusted for use in a DSS concept, so that these reserved symbols are used for NR signals instead of eMBMS. While in general LTE PDCCH can occupy from 1 to 3 symbols (based on cell load), the first two OFDM symbols of such MBSFN subframe are used for LTE PDCCH, and DSS NR UE can use the third symbol. Using MBSFN is completely transparent to legacy LTE-only devices from 3GPP Release 9 onwards, as such LTE UE knows that these subframes are used for other purposes. In this sense this is the simplest way of deploying DSS. This method has disadvantages though. The main one is that if MBSFN subframes are used very frequently and it takes away resources from LTE users, heavily reducing LTE-only user throughput. Note that option 1 shown in figure 1 does not require LTE MBSFN Reference Signals to be used, because the MBSFN subframe is used to mute the subframe for DSS operation only, and LTE CRS shall only be transmitted in the non-MBSFN region (within the first two symbols) of the MBSFN subframe.

The two other options illustrated in figure 1 are dealing with non-MBSFN subframes that contain LTE reference signals. Option 2 is ‘mini-slot’ based; mini-slot scheduling is available in NR for URLLC applications that require extremely low latency. The symbols can be placed anywhere inside the NR slot. In respect to DSS, mini-slot operation just eliminates the usage of the symbols that contain LTE CRS and schedule only free ones for NR transmission. The basic limitation of this method comes from the concept itself. It is not very suitable for eMBB applications as too many resources are outside of NR scheduling. However it still can be utilized in some special cases like 30 kHz SSB insertion which will be described later in this paper.

Option 3 is based on CRS rate matching in non-MBSFN subframes, and it is expected to be the one most commonly used for NR data channels. In this option, the UE performs puncturing of REs used by LTE CRS so that the NR scheduler knows which REs are not available for NR data scheduling on PDSCH (Physical Downlink Shared Channel). The implementation of this option can be either Resource Block (RB)-level when the whole RB containing LTE CRS is taken out of NR scheduling, or RE-level where NR PDSCH scheduling avoids particular REs only. The end result of this method is that the scheduler will reduce the NR PDSCH transport block size as the number of REs available for scheduling become less in a slot.


Personally, I am not a big fan of DSS mainly because I think it is only useful in a very few scenarios. Also, it helps operators show a 5G logo but doesn't provide a 5G experience by itself. Nevertheless, it can come in handy for the coverage layer of 5G.


In one of the LinkedIn discussions (that I try and avoid mostly) somebody shared this above picture of Keysight Nemo DSS lab test results. As you can see there is quite a bit of overhead with DSS.

Thursday 14 May 2020

A Look into 5G Virtual/Open RAN - Part 4: Intra-gNB DU Handover

In the previous posts of this series I described O-RAN interfaces and protocols, connection establishment and connection release procedures. Now it is time to look at handovers.

As mentioned in one of the earlier posts the gNB-CU CP will be in charge of controlling hundreds of gNB-DUs in a similar way like the 3G RNC was in charge of controlling hundreds of UMTS NodeBs. As a result the most common 5G SA intra-system handovers will be intra-gNB handovers. These handovers can further be classified into intra-gNB-DU handovers (inter- as well as intra-frequency) and inter-gNB-DU handovers.

Due to the virtualization of RAN network functions we will also find another form of switching transmission path, which is a change of the gNB-CU UP during the call without mobility of the UE. This scenario I will discuss later in a separate blog post.

Today I want to focus on the intra-gNB DU handover. Here the UE moves from one cell to another one within the same distributed unit as shown in the figure below.



A prerequisite is the successful establishment of a NR RRC connection and a F1AP UE Context between the gNB-DU and the gNB-CU CP.

The F1AP transports all RRC messages between these two entities. Indeed, it transports the PDCP blocks and the gNB-DU is not aware that these PDCP blocks contain RRC messages. However, for better illustration I have not shown the PDPC part in the ladder diagram.

What we see in step 1 is a NR RRC Reconfiguration message that contains RRC measurement configurations to be enabled on the UE side. A typical trigger event for intra-frequency handovers is the A3 event that is already known from LTE RRC.

Once the UE detects a better neighbor cell meeting the A3 criteria it sends a RRC Measurement Report to the gNB-CU CP (step 2).

In step 3 the gNB-CU CP orders the gNB-DU to perform a F1AP UE Context Modification. The purpose is to allocate radio resources for the UE in the target cell and to prepare the cell change.

The gNB-DU replies with F1AP UE Context Modification Response. This messages contains the new C-RNTI and a large block of lower layer configuration parameters (e.g. for RLC and MAC layer) that need to be sent to the UE and thus, need to be transported to the gNB-CU CP before, because it is the only RAN function capable to communicate with the UE using the RRC protocol.

Hence, in step 5 we see another downlink RRC message transfer. This time it is used to transport the handover command towards the UE. The handover command is a NR RRC Reconfiguration message and it contains the new C-RNTI (new UE identity within the cell) as well as the physical cell ID of the target cell and the full set of lower layer configuration parameters previously provided by the gNB-DU.

When the gNB-CU CP receives the RRC Reconfiguration Complete message sent by the UE in step 6 the handover is successfully completed and the UE is now served by the cell with NR PCI 2.

As mentioned before there is neither XnAP (communication between two neighbor gNBs) nor NGAP (communication between gNB and AMF) involved in this handover procedure.

Related Posts:

Monday 11 May 2020

5G Remote Surgery and Telehealth Solutions


One of the most controversial 5G use cases is the remote surgery. In this post I want to quickly look at the history and what is possible. Before I go to that, here is a short summary video that I am embedding upfront.



As far as I can recall, Ericsson was the first vendor that started talking about remote surgery. This is a tweet from back in 2017.


Huawei didn't want to be far behind so they did one at MWC Shanghai in 2018. Their tweet with video is embedded below.


In January 2019, South China Morning Post (SCMP) showed a video of a remote surgery on an animal. While the video and the article didn't provide many details, I am assuming this was done by Huawei as detailed here. The video of the surgery below.



This was followed by Mobile World Congress 2019 demo where a doctor used 5G to direct surgery live from a stage at MWC to Hospital Clinic Barcelona over 3 miles away. The team of doctors was removing a cancerous tumor from a patient's colon. This video from that is embedded below.



Vodafone New Zealand had a silly remote surgery of a dog video but looks like they have removed it.  Nothing can beat this Telecom Italia ad embedded below.



There are some realistic use cases. One of them being that with 5G the number of cables / wires in a hospital can be reduced saving on the disinfection.
NTT Docomo showcased 5G Mobile SCOT (Smart Cyber Operating Theater) which is an Innovative solution to enable advanced medical treatment in diverse environments. You can read more details here.

There are lots of other things going on. Here is a short list:
  • April 2020: Because of Coronavirus COVID-19, NT Times has an article on Telemedicine Arrives in the U.K.: ‘10 Years of Change in One Week’ - even though this does not involve 5G, it just shows that we are moving in that direction.
  • February 2020: 5G-aided remote CT scans used to diagnose COVID-19 patients in China (link)
  • February 2020: Verizon teamed with Emory Healthcare to test new 5G use cases for the medical industry at the latter’s Innovation Hub in Atlanta, in a bid to discover how the technology can be used to improve patient care. The collaboration will explore applications including connected ambulances; remote physical therapy; medical imaging; and use of AR and VR for training. (link)
  • February 2020: Vodafone 5G Healthcare – Conference & Experience Day (link)
  • November 2019: TIM enables first live remote-surgery consultation using 5G immersive reality (link)
  • October 2019: Along with a hospital in Malaga, Telefónica has presented what it claims is the first expert assistance system for medical interventions that runs on 5G. (link and video)
  • September 2019: Mobile Future Forward 2019 - World's First Remote VR Surgery Demo conducted on Sept 4th, 2019 in Seattle by Chetan Sharma, James Youngquist, Evie Powell, Nissim Hadar, David Colmenares, and Gabe Jones. (link)

Finally, a nice video on Benefits of 5G for Healthcare Technology by T-Mobile



Related Posts:

Thursday 7 May 2020

How the A6 Measurement Event triggers Secondary Cell Change in LTE Carrier Aggregation Calls


Last week I read in Martin Sauter's blog about the LTE RRC A6 measurement event.

Although I am quite interested in RRC measurements I have never seen the A6 event in action. Rather the eNB vendors have implemented carrier aggregation in a way that the UE provides its capabilities and according to the this the maximum possible numbers of component carriers is added to the connection. There is no RRC measurement report before adding secondary LTE cells to the connection. So what is the A6 event good for and is it used at all?

Surprisingly I needed only 2 attempts to find an example of using the A6 event in a live network configuration. It is used when more component carriers are available than the UE can simultaneously handle. E.g. if there are 4 or more cells with different carrier frequencies available in the same antenna sector the A6 event ensures after the initial CA configuration that the cells with the best radio conditions are selected as secondary cells.

Let's have a look at this scenario in detail. Figure 1 shows the report configuration for the A6 event. Keep the reportConfigId = 3 in mind.


Figure 1: Report Configuration for Event A6

The next step is the configuration of the Measurement ID as shown in figure 2. Here the reportConfigId is combined with a measObjectId that represents the carrier frequency of the potential SCell.

Figure 2: Measurement ID for Event A6
Now, if the event A6 is triggered in the UE a RRC Measurement Report with this measId = 3 is sent to the eNB as shown in Figure 3.

Figure 3: RRC Measurement Report for Event A6
There we see the RSRP and RSRQ of the primary cell (PCell) and of the currently serving secondary cells (SCells). By the way the servFreqId stands for the sCellIndex value that was linked to the physical cell ID (PCI) when this SCell was added in a previous RRC Connection Reconfiguration procedure. 

And as one can see the neighbor cell with PCI = 470 has significantly better RSRP and RSRQ to offer than both currently used SCell. 

Consequently the eNB decides to replace the SCell with sCellIndex value 1 with the better cell (PCI 470). This is again done with a RRC Connection Reconfiguration procedure as shown in figure 4. And this is the way how the A6 event is used.


Figure 4: Change of SCell
  

Wednesday 6 May 2020

Virve 2.0 - Finland's 4G/5G Public Safety Network

State Security Networks Group Finland (Erillisverkot) safeguards the Finnish society by offering authorities and critical operators engaged in critical infrastructure and services secure and reliable ICT services. Much like in the civilian world, communication between authorities includes transferring images and video material to an increasing degree, which results in ever-growing data transfer volumes and, subsequently, new kinds of demands for all communication networks. 


Virve is a means of ensuring communication and cooperation between authorities and other partners across organisational borders into the future. It also entails the introduction of a higher service standard, as the transfer to broadband, estimated to take place in 2022, will make it possible to transfer video material, images and data. This will mean that it will be possible to send video material in a reliable and secure way in the case of accidents, for example. The radio network Virve, based on Tetra technology, will reach the end of its lifecycle by the end of the 2020s. The current Virve network will be used simultaneously with the new Virve 2.0 network until, at least, 2025.


Erillisverkot will acquire the broadband Virve 2.0 radio access network as a service from Elisa and the core systems from Ericsson. Separate networks will ensure the continuity of critical communications and operational capability of public safety in all situations in the future.

I would assume this would be MOCN, similar to the UK deployment of ESN networks as shown here.

Virve 2.0 subcribers will use Elisa’s public radio network, which the operator is expanding to become Finland’s largest data and voice network.

About 80 million messages pass through the Virve system every week. Elisa is committed to increasing the coverage, capacity and verification of its mobile network to meet the requirements of Virve 2.0.

The new online services will provide support for critical communication between public authorities and other parties.

The addition of image, video, and other wireless broadband services alongside existing Virve services will enable a better and more up-to-date view of the day-to-day operations of authorities and other actors.

The IoT enables automatic monitoring of rescue personnel and mobile use of surveillance cameras and drones.

The Virve 2.0 radio network service will be in use from 2021 and will include the 4G and 5G technologies and the internet of things. The contract is for ten years.

Finally, a recent advert of Elisa explaining 5G to outside world



Further Study:
  • Erillisverkot: Obstacles for MCX Broadband and how to overcome them [PDF]
  • Erillisverkot: Virve Broadband Plans for the Future - Critical Communications Europe 2019 [PDF]
  • 5G-XCast Whitepaper: Rapidly Deployable Network System for Critical Communications in Remote Locations [PDF]
  • Erillisverkot: White paper - Virve 2.0 RFI Summary of responses [PDF]
  • Erillisverkot: Factsheet - What is Virve 2.0? [PDF]

Related Posts:

Friday 1 May 2020

The Futuristic Concept of 'Smart & Intelligent' Batteries


I did a presentation back in 2013 on the concept of smart batteries. Even though there has been a lot of progress in wireless charging since back then, it hasn't reached even close to the vision that I have. As a result, I converted it into a video to start a discussion on if and when this would be possible. The slides and video are embedded below and I welcome any discussion in comments below.