My last blog post discussed the intra-gNB-DU handover. Now it is time to look at inter-gNB-DU handover. This means: the target cell is located in the same gNB, but connected to a different gNB Distributed Unit (gNB-DU) than the source cell.
The figure below shows the message flow:
As you can see it was not so easy to show all the messages in one flow chart and again I have simplified things a little bit. So it is not shown that NR RRC messages are transparently forwarded by the gNB-DU when sent to or received from the UE.
It should also be noted that between step 8 and 9 the UE performs a random access procedure on the radio interface that is also not shown.
Beside this the RRC measurement configuration and measurement report is identical with the same procedure in the intra-gNB-DU handover case (step 1+2)
However, due to the fact the target cell is connected to a different gNB-DU a new F1AP UE context must be established on the incoming F1-C leg (step 3+4). As in a new connection setup scenario the target gNB-DU provides all necessary lower layer parameters for the target cell radio link including a new c-RNTI.
Since we need also a new user plane transport tunnel to exchange payload on the F1-U interface between the target gNB-DU and the gNB-CU UP an E1AP Bearer Context Modification procedure is performed in step 5+6.
The following F1AP UE Context Modification Request is used to transmit the handover command (NR RRC Reconfiguration message with target cell parameters) towards the UE (step 7). In step 8 the F1AP UE Context Modification Response confirms that the handover command was forwarded to the UE.
After successful random access the UE sends NR RRC Reconfiguration Complete message on the new radio link (step 9) and this triggers the F1AP UE Context Release procedure on the outgoing F1-C leg.
Related Posts:
The figure below shows the message flow:
(Click on the image to enlarge)
As you can see it was not so easy to show all the messages in one flow chart and again I have simplified things a little bit. So it is not shown that NR RRC messages are transparently forwarded by the gNB-DU when sent to or received from the UE.
It should also be noted that between step 8 and 9 the UE performs a random access procedure on the radio interface that is also not shown.
Beside this the RRC measurement configuration and measurement report is identical with the same procedure in the intra-gNB-DU handover case (step 1+2)
However, due to the fact the target cell is connected to a different gNB-DU a new F1AP UE context must be established on the incoming F1-C leg (step 3+4). As in a new connection setup scenario the target gNB-DU provides all necessary lower layer parameters for the target cell radio link including a new c-RNTI.
Since we need also a new user plane transport tunnel to exchange payload on the F1-U interface between the target gNB-DU and the gNB-CU UP an E1AP Bearer Context Modification procedure is performed in step 5+6.
The following F1AP UE Context Modification Request is used to transmit the handover command (NR RRC Reconfiguration message with target cell parameters) towards the UE (step 7). In step 8 the F1AP UE Context Modification Response confirms that the handover command was forwarded to the UE.
After successful random access the UE sends NR RRC Reconfiguration Complete message on the new radio link (step 9) and this triggers the F1AP UE Context Release procedure on the outgoing F1-C leg.
Related Posts: